Lighting Products QC · On-Site Inspection Issuance
照明灯具产品行业质量验收报告表
Lighting Products Inspection & Acceptance Report
依据标准 / Standard: ISO 2859-1, General Inspection Level II (Normal Inspection) · 判定方案 / Decision Schemes: CR AQL 0 / Maj AQL 2.5 / Min AQL 4.0
填写说明请参阅配套文档《照明灯具产品行业质量验收报告表填写指南》 / For instructions, please refer to the accompanying “Lighting Products Inspection & Acceptance Guide”
1. 检验基本履历与抽样方案设定 / Inspection General Profile & Sampling Plan
| 供应商名称 Supplier Name |
采购订单号 (PO) PO Number |
检验执行日期 Inspection Date |
|||
| 产品品名 / SKU Product Name / SKU |
灯具技术类型 Technology Type |
|
|||
| 驱动电源方案 Driver Scheme |
|
大货总数量 (pcs) Total Order Qty (pcs) |
|||
| 现场总箱数 (CTN) Total Cartons (CTN) |
包装完成比例 Packing Completion Ratio |
|
|||
| 抽样字码 / 样本量 Sampling Code Letter / Sample Size (n) |
字码 / Code / n = pcs | 随机抽样箱号记录 / Randomly Selected Carton Nos. Record(须覆盖货垛之前、后、上、下、左、右,严格执行分层随机抽样) | |||
| 随机抽样箱号记录 Randomly Selected Carton Nos. Record |
|||||
2. 关键物理与光学指标实测(规格书比对) / Key Physical & Optical Dimensions (Compared with Spec)
注:每批随机抽测 5–10 pcs,记录最大、最小及均值。任一单项超出规格书允差,须在「不合格数」栏如实填写不合格单品数量。 / Randomly test 5–10 pcs per lot; record min/max/avg. Enter actual defect qty for any out-of-tolerance item.
| 检验项目 Inspection Item |
客户规格书标准 Client's Spec & Tolerance |
实测最小值 Min. Found |
实测最大值 Max. Found |
实测平均值 Avg. Found |
不合格数 Defect Qty |
测量工具 Measuring Tool |
|---|---|---|---|---|---|---|
| 单品整灯功率 (W) Rated Power (W) |
功率数字电参数表 Power Meter |
|||||
| 工作电流 (mA) Drive Current (mA) |
电参数测试仪 Power Tester |
|||||
| 相关色温 (CCT / K) Color Temperature |
便携式光谱仪 Spectrometer |
|||||
| 显色指数 (Ra) Color Rendering Index |
便携式光谱仪 Spectrometer |
|||||
| 整灯装配高度/外径 (mm) Total Dimension (mm) |
数显卡尺/卷尺 Caliper / Tape |
|||||
| 单灯净重 (g/kg) Unit Net Weight |
电子克重秤 Electronic Scale |
逻辑闭环 / Logic Loop: 此处「不合格数」栏发现的任何不合格单品数量,必须如实、百分之百累加至「第 4 部分」严重缺陷(Maj)总数中,共同参与 AQL 判定。严禁漏记。 / Any defect qty recorded here must be fully rolled into Section 4 Major (Maj) total for AQL decision. No omission allowed.
3. 现场安全、功能性及可靠性测试(SOP 强力执行) / Safety & Functional Tests
注:QC 现场必须按以下标准 SOP 操作,无设备则勾选「现场无设备」并即时汇报,严禁虚构数据。 / QC must follow SOP on-site; if no equipment, mark accordingly and report immediately. No fabricated data.
| 测试模块 Test Module |
标准操作要求 Standard Operating Procedure (SOP) |
执行状态 Status |
实测现象与数据记录 Test Findings & Data |
判定 Verdict |
|---|---|---|---|---|
| 高压介电耐压测试 Hi-Pot Test |
输入端与外壳金属裸露处施加高压(I 类灯具通常 AC 1500V,II 类 AC 3750V),测试时间 1s–60s,设置漏电流报警值(通常 5 mA),检查是否击穿。 Apply high voltage between input and exposed metal (Class I: AC 1500V, Class II: AC 3750V), 1s–60s, leakage alarm typically 5 mA; check for breakdown. |
实测电压 / Voltage: V / 漏电流 / Leakage: mA 现象 / Phenomenon: |
||
| 接地电阻测试 Ground Resistance |
仅适用于 I 类灯具。在外壳接地端子/金属裸露处与输入接地线间通 25A 电流,测试电阻值。标准要求电阻值 ≤ 0.1 Ω。 Class I only. Apply 25A between ground terminal and input ground wire. Standard: resistance ≤ 0.1 Ω. |
实测最大电阻值 / Max Resistance: Ω | ||
| 低压/输入电压宽幅启动测试 Low Voltage Startup |
调压器将电压降至额定电压下限(如额定 220V,降至 180V),或直接调至 90V(宽压驱动),频繁开关 5 次,检查灯具能否正常瞬间点亮、无闪烁。 Reduce voltage to lower limit (e.g., 180V for 220V rated) or 90V for wide-range driver; switch on/off 5 times; check instant start without flicker. |
|||
| 快速点灭寿命冲击(电涌) On/Off Switching Shock |
额定电压下,执行 [通电 5s → 断电 5s] 为一个循环,连续冲击 20 次。检查灯具、驱动电源以及 LED 光源是否损坏、变色。 At rated voltage, cycle [on 5s → off 5s] for 20 times. Check lamp, driver, and LED for damage or discoloration. |
|||
| 光输出频闪测试 Flicker & Ripple Test |
使用频闪仪测量;若无专业设备,将手机摄像头切换至录像模式(或高快门模式)对准发光面,目视观察屏幕是否有肉眼可见的水波纹横向条幅。 Measure with flicker meter; if unavailable, use phone camera (video/high-shutter mode) aimed at light panel; check for visible ripple bands on screen. |
|||
| 接地线拉力测试 Cord Anchorage Test |
对灯具电源线输入引出端进行拉力测试(根据线重施加 30N/60N 拉力,维持 1s,连续 25 次),检查电源线是否有位移、滑出或内部接线受损。 Pull test on power cord entry (30N/60N per cord weight, 1s hold, 25 cycles). Check for displacement, slippage, or internal wire damage. |
位移量 / Displacement: mm 现象 / Phenomenon: |
||
| 结构防水与关键元器件核对 Waterproof Structure & Critical Component Verification |
针对室外/防水灯具(路灯、投光灯等),至少拆解 2 pcs 样品的驱动腔体与光源腔体,目视检查防水硅胶圈是否平整、无位移、无溢胶;核对驱动壳体 tc 极限温度铭牌是否与规格书 BOM 一致。 For outdoor/IP-rated lamps: disassemble ≥2 pcs driver & light chambers; inspect silicone gasket flatness/position/excess glue; verify driver tc max temp label matches Spec BOM. |
硅胶圈 / Gasket: tc 铭牌 / tc Label: °C / BOM: °C |
||
| 整灯组装配合与装配测试 Assembly & Fit Test |
抽取样品与配套的安装配件(挂板、螺丝、吸顶盘、支架)在模拟天花板/导轨上实际组装 5 套。检查结构件是否干涉、滑丝、缝隙过大。 Assemble 5 sets with mounting accessories (bracket, screws, ceiling plate) on simulated ceiling/track. Check interference, stripped threads, excessive gaps. |
|||
| 运输跌落测试(大货整箱) Carton Drop Test |
针对已包装成品外箱,按标准高度执行 1 角 3 边 6 面自由落体跌落。跌落后开箱全检,检查灯具内部变压器是否脱落、外壳变形、功能。 Packed master carton dropped from standard height: 1 corner, 3 edges, 6 faces. Full inspection after drop for loose transformer, deformation, function. |
4. 外观与结构缺陷统计明细(按严重程度分类) / Defect Summary
| 缺陷等级 Defect Classification |
对应 AQL AQL Limit |
合格接收数 Ac Accept (Ac) |
不合格拒收数 Re Reject (Re) |
现场具体缺陷描述(箱号 + 位置 + 现象 + 数据/数量) Specific Defect Description On-Site (Carton No. + Location + Symptom + Data/Qty) |
实际计数值 Found |
|---|---|---|---|---|---|
| 致命缺陷 (CR) Critical Defect (CR) |
AQL 0 | 0 | 1 | ||
| 严重缺陷 / Major Defect (Maj) | AQL 2.5 | ||||
| 轻微缺陷 / Minor Defect (Min) | AQL 4.0 |