Factory Audit · On-Site Assessment Issuance
工厂合规与系统评估审核表
Factory Compliance & System Assessment Audit Checklist
依据标准 / Applicable Standards: QMS (Quality Management System), CoC (Code of Conduct), EHS (Environment, Health & Safety), C-TPAT (Customs-Trade Partnership Against Terrorism) — General Requirements
填写说明请参阅配套文档《工厂核验执行标准与现场评估协定》 / For methodology, refer to the accompanying Factory Audit Execution Standard & On-Site Assessment Protocol
一、厂务基础信息与技术参数 / Section 1 — General Profile & Technical Parameters
| 工厂官方名称 Factory Legal Name |
|||
| 工厂详细地址 Factory Address |
|||
| 最高管理者/陪同人 Top Management / Escort |
职务 Title |
||
| 主要生产产品品类 Main Product Categories |
|||
| 设计年产能 Designed Annual Capacity |
现场实际员工人数 On-Site Headcount |
||
| 审核日期 Audit Date |
审核员姓名/机构 Auditor / Organization |
||
| 审核类型 Audit Type |
|
||
| 审核范围勾选 Scope Covered |
|
||
| 追溯性抽样审查期间 Historical Traceability Sampling Period |
|||
二、核心审查板块细则 / Section 2 — Core Audit Modules
提示:证据须可复核(文件编号、照片附图号、访谈人数)。NC 描述公式 = 位置 + 违规事实 + 法规/标准条款 + 证据编号。/ Guidance: All evidence must be verifiable (document ref no., photo evidence id, interview headcount). NC description formula = Location + Finding + Applicable standard clause + Evidence ref.
1. 技术与质量管理体系(QMS) / Quality Management System (QMS)
| 审查子项 Sub-Module |
评估要点 Assessment Criteria |
现场证据 / 抽样单据 On-Site Evidence / Sampled Records |
合规判定 Compliance Verdict |
|---|---|---|---|
| 1.1 供应链源头与进料检验(IQC) Supply Chain Source & Incoming QC (IQC) |
|
|
|
| 1.2 生产过程控制(IPQC) In-Process Quality Control (IPQC) |
|
|
|
| 1.3 测量仪器与量具管理 Measuring Equipment (Equipment Calibration & Traceability) |
|
|
2. 社会责任与劳资合规(CoC) / Social & Ethical Compliance (CoC)
| 审查子项 Sub-Module |
评估要点 Assessment Criteria |
现场证据 / 抽样单据 On-Site Evidence / Sampled Records |
合规判定 Compliance Verdict |
|---|---|---|---|
| 2.1 童工与未成年工保护 Child & Young Worker Protection |
|
|
|
| 2.2 工作时间与薪酬福利 Working Hours & Compensation |
|
|
|
| 2.3 强迫劳动与不人道待遇 Forced Labor & Inhumane Treatment |
|
|
3. 环境、健康与职业安全(EHS) / Environment, Health & Occupational Safety (EHS)
| 审查子项 Sub-Module |
评估要点 Assessment Criteria |
现场证据 / 抽样单据 On-Site Evidence / Sampled Records |
合规判定 Compliance Verdict |
|---|---|---|---|
| 3.1 消防与安全疏散 Fire Safety & Evacuation |
|
|
|
| 3.2 机械设备安全与 PPE Machinery Safety & PPE |
|
|
|
| 3.3 化学品与环境合规 Chemical Management & Environmental Compliance |
|
|
4. 供应链反恐安全(C-TPAT) / Supply Chain Security (C-TPAT)
| 审查子项 Sub-Module |
评估要点 Assessment Criteria |
现场证据 / 抽样单据 On-Site Evidence / Sampled Records |
合规判定 Compliance Verdict |
|---|---|---|---|
| 4.1 物理安全与装柜 Physical Security & Container Loading |
|
|
三、不合规项(NC)汇总表与现场确认记录 / Section 3 — Non-Conformance (NC) Summary & On-Site Confirmation
缺失描述须含:位置 + 违规事实 + 违反法规/标准条款 + 附图编号(参见执行标准协定第 5 节黄金公式)。/ NC descriptions must include: Location + Finding + Applicable regulation/standard clause + Photo evidence ref (see Section 5 of the Execution Standard Protocol).
示例 / Example: At the northeast side of Production Workshop 2, one evacuation exit was fully blocked by pallets — PRC Fire Protection Law Art. 28 (Photo Ref 11) / 2号车间东北侧疏散口被卡板完全阻挡,违反《消防法》第28条(附图11)。
1. 致命缺陷 / 零容忍项(Critical NC)
| No. | 缺失描述(位置 + 事实 + 法规条款 + 附图号)/ NC Description (Location + Finding + Clause + Photo Ref) |
|---|---|
| 1 | |
| 2 | |
| 3 |
2. 严重缺陷(Major NC)
| No. | 缺失描述 / NC Description | 要求整改期限 Corrective Action Due Date |
|---|---|---|
| 1 | ||
| 2 | ||
| 3 |
3. 轻微缺陷(Minor NC)
| No. | 缺失描述 / NC Description |
|---|---|
| 1 | |
| 2 | |
| 3 |
| NC 数量统计 NC Count Summary |
Critical: Major: Minor: |
| 工厂是否限制审核范围 Restricted Audit Scope? |
|
四、审核结论与后续行动 / Section 4 — Audit Conclusion & Follow-up Actions
Within the stated business days of signing, the factory shall submit a CAPA plan including root cause analysis, short-term corrective actions, and long-term preventive measures. Major NC physical remediation re-verification deadline as noted above.
This assessment is based on blind-sampled documentation review, on-site walk-through, and employee interviews. This report does not relieve the factory of contractual obligations for systemic compliance risks discovered subsequently. The auditor is accountable for the evidence chain (Say–Do–Prove / Triangulation of Evidence).